2017-2019 TETFund

Zonal & Annual Intervention in FUO

 

  •  Construction of 3Nr students Lavatory with 8Nr Toilet Rooms each (4Nr forMale and Female), including each a borehole.
  • Construction of Deans Block for School of Post Graduate Studies
  • Construction of Post Graduate Library
  • Construction of Office Block with Covered Walkway
  • Construction of Classroom Block for Post Graduate Studies
 

2017 TETFund ZONAL INTERVENTION

2017-2019 TETFund ANNUAL INTERVENTION