2017-2019 TETFund
Zonal & Annual Intervention in FUO
- Construction of 3Nr students Lavatory with 8Nr Toilet Rooms each (4Nr forMale and Female), including each a borehole.
- Construction of Deans Block for School of Post Graduate Studies
- Construction of Post Graduate Library
- Construction of Office Block with Covered Walkway
- Construction of Classroom Block for Post Graduate Studies
2017 TETFund ZONAL INTERVENTION

2017-2019 TETFund ANNUAL INTERVENTION
